Adding 3-point estimates
Adding 3-point estimates for task
duration and start times
1. On the Gantt view, double-click on the task ID.
2. Click the General tab.
3. Select a Base, Low, and
High dates for Start Time.
4. Select a Base, Low, and
High values for Duration. By default when
you enter a value for duration, the default values for Low and High
are calculated based on the defaults set in the Duration
Options.
5. Click OK to save the estimates.
Adding 3-point estimates for task cost
and income
1. On the Cost and Revenue
view, select the task to which you want to add cost and income
estimates
2. Enter cost data for Cost Low,
Cost, and Cost High. By default
when you enter a value for Cost, the default values for Low and High
are calculated based on the Cost defaults set in the Cost
Options.
3. Enter income data for Inc. Low, Income,
and Inc. High.
4. Click OK to save the estimates.
Adding 3-point estimates for lags
1. On the Gantt view, double-click on the task ID.
2. Click the Predecessor tab.
3. Enter Low, Base, and
High Lag. Default statistical distribution will be
generated automatically. There are only two distributions for lag:
Uniform and Triangular.
4. Click OK to save the estimates.
See also
Assigning Low and High Estimates for Duration and Cost for Group of Tasks
Defining task distributions
|