Name of parameters (shown on the tool tip) |
Finish time
of the
risk occurrence |
|
|
Type of the field |
Edit Box with Spin
Control |
|
|
Short name (shown in the
header) |
Finish
|
|
|
Description |
Risk cannot occur
after
this
time. Time is defined as a percent of
total task duration. For example, task duration is5 days. Finish
time of risk occurrence 80% means that risk will occur before
the end of fourth day.
|
|
|
Related
Fields |
Moment of Risk Distribuition chart Most likely
time of the risk occurrence Start time of the risk
occurrence
|
|