Duration Low- Results

Name of parameters (shown on the tool tip)

Duration low- result

Type of the field

Static Text

Short name (shown in the header)

Low Dur

Description

Low duration as a result of probabilistic calculations. It is blank for current schedule calculations. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Duration Base- result

Duration High- result