Task Related Fields

Duration High Result- Current Schedule

Name of parameters (shown on the tool tip)

Duration High result (P90, P95,P99,Max)

Type of the field

Static Text

Short name (shown in the header)

High Dur

Description

High duration as a result of probabilistic calculations. It is blank for current schedule calculation. Can be maximum, P90, P95, P99. It is defined in Options (Calculation tab).

Related Fields

Duration Base Result- Current schedule

Duration Low Result- Current schedule