Task Related Fields
Finsish Time High Result
Name of parameter (shown on the tool tip)
Finish Time High - result (min, P1, P5, or P10)
Type of the field
Static Text
Short name (shown in the header)
Finish High
Description
High finish time as a result of probabilistic calculations. Will have no value in the current schedule calculation. Can be maximum, P90, P95, P99. It is defined in Options (Calculation tab).
Related Fields
Finish Time MeanFinish Time Low