Task Related Fields

Finsish Time High Result

Name of parameter (shown on the tool tip)


Finish Time High - result (min, P1, P5, or P10)

Type of the field

Static Text

Short name (shown in the header)

Finish High

Description

High finish time as a result of probabilistic calculations. Will have no value in the current schedule calculation. Can be maximum, P90, P95, P99. It is defined in Options (Calculation tab).

Related Fields

Finish Time Mean
Finish Time Low