Task Related Fields
Finish Time Low Result
Name of parameter (shown on the tool tip)
Finish Time Low - result (min, P1, P5, or P10)
Type of the field
Static Text
Short name (shown in the header)
Finish Low
Description
Low finish time as a result of probabilistic calculations. Will have no value in the current schedule calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).
Related Fields
Finish Time MeanFinish Time High