Name of parameter (shown on the tool tip) |
Finish Time Low - result
(min, P1, P5, or P10)
|
|
|
Description |
Low finish time as a result
of probabilistic calculations. Will have no value in the
current schedule calculation. Can be minimum, P1, P5, P10. It
is defined in Options (Calculation tab).
|
|