User's Guide to
RiskyProject
Task Related Fields
Fixed Cost - High
Name of parameter (shown on the tool tip)
Fixed Cost High
Type of the field
Edit Box with Spin control
Short name (shown in the header)
Cost High
Description
High fixed cost (not associated with resources). Used for probabilistic calculation only. Particular meaning of it depends on statistical distribution for cost. See “How to define distribution for Start Time, Cost, Income, and Duration”.
Related Fields
Fixed Cost - AccrualFixed Cost - Base Fixed Cost - Low
Copyright © Intaver Institute Inc., 2002-2006. All Rights Reserved