Task Related Fields

      Start Time Low - result

Name of parameters (shown on the tool tip)


Start Time Low - result (min, P1, P5, or P10)

Type of the field

Static Text 

Short name (shown in the header)

Start Low

Description


Low start time as a result of probabilistic calculations. It is blank for current schedule calculation. Can be minimum, P1, P5, P10. It is defined in Options (Calculation tab).

Related Fields

Start Time High- result
Start Time Mean - result
Start Time of the task (Base)

 