Task Related Fields

     Total Task Cost High - result

Name of parameters (shown on the tool tip)


Total Task Cost High - result (P90, P95, P99, or max)

Type of the field

Static Text

Short name (shown in the header)

Cost High

Description


Total high cost (fixed task cost plus variable cost, e.g. associated with resource) as a result of probabilistic calculation. Will have no value in the current schedule calculation. Can be maximum, P90, P95, P99. It is defined in Options (Calculation tab).

Related Fields

Total Task Cost Base
Total Task Cost Low - result
Total Task Cost Mean - result

 