Task Related Fields
Total Task Cost Low - result
|
Name of parameters (shown on the tool tip) |
Total Task Cost Low - result (min, P1,
P5,
or P10)
|
|
|
Type of the field |
Static Text |
|
|
Short name (shown in the
header) |
Cost
Low
|
|
|
Description |
Total low cost (fixed task cost plus
variable cost, e.g. associated with resource) as a result of
probabilistic calculation.
Will have no value in
the current schedule calculation. Can be minimum,
P1, P5, P10. It is defined in Options
(Calculation tab).
|
|
|
Related
Fields |
Total Task Cost
Base Total Task Cost High- result Total Task Cost Mean
- result
|
|
|