User's Guide to
RiskyProject
Field Descriptions
Tasks
Actual Income
Actual Cost
Display Tracking Chart Checkbox
Task Duration Low – current schedule
Duration High
Duration High Result
Task Duration Low – Results
Duration Mean Result
Duration Mean Statistical Result
Effort Driven Task check box
Finish Time High Result
Finish Time Low Result
Finish Time Mean Result
Fixed Cost Accrual
Fixed Cost - Base
Fixed Cost - High
Fixed Cost - Low
Ignore Resource Calendar
Income Accrual
Income Base
Income High
Income High Result
Income Low
Income Low Result
Income Mean Result
Milestone Check box
Notes
Percent Completed
Present Task on the Risk Chart
Resource Cost Base
Resources
Revenue Base
Revenue High
Revenue Low
Revenue Mean
Seed for Monte Carlo Simulation Duration
Seed for Monte Carlo Simulation Fixed Cost
Seed for Monte Carlo Simulation Income
Seed for Monte Carlo Simulation Start Time
Sensitivity Coefficient Cost
Sensitivity Coefficient Duration
Show Risk Table Flag
Start Time High - resultg
Start Time Low - result
Start Time Mean - result
Start Time Task Base
Start Time Task High
Start Time Task Low
Statistical Distribution for Duration
Statistical Distribution for Fixed Cost
Statistical Distribution for Start Time
Success Rate
Task Calendar
Task Name
Total Cost (Base)
Total Task Cost High - result
Total Task Cost Low - result
Total Task Cost Mean - result
Work Base – cur. schedule
Work High – cur. schedule
Work High Result
Work Low – cur. schedule
Work Low Result
Work Mean Result
Base Calendar
Draw chart
Material label
Maximum units
Resource description
Resource Initials
Resource Name
Standard Rate
Type
Risk
Risk Assigned to Task/Resource
Chance that risk will occur
Color for probability wheel
Distribution
Distribution Chart
Finish time of the risk occurrence
Most likely time of the risk occurrence
Outcome of the risk
Result of the outcome
Risk Alternative
Risk Description
Risk Enabled
Risk Impact for Cost
Risk Impact for All Parameters
Risk Impact for Duration
Risk Mitigation Plan
Risk Name
Seed for outcome
Start time of the risk occurrence
Sensitivity
Impact (current schedule)
Impact (Post-mitigation)
Impact (Pre-mitigation)
Note
Opened or closed risk
Parameter Name
Parameter Type
Probability (current schedule)
Probability (Post-mitigation))
Probability (Pre-mitigation))
Risk or Issue
Score Current Schedule
Score (Post-mitigation)
Score (Pre-mitigation)
Sensitivity Chart
Sensitivity Coefficient
Show risk on the matrix
Task ID
Threat or opportunity (current schedule)
Copyright © Intaver Institute Inc., 2002-2009. All Rights Reserved